In-Situ Measuring Campaign at the Hydropower Plant ‘‘Perućica’’, Montenegro - Part 1: Open Channel System - page 2

 

Table 1: Characteristics data for existing dams and reservoirs

Table1

 

Table 2: Characteristics data for existing canals

Table2

 

The settling basin (forebay) in front of the power intake ‘’Marin Krst’’ is shown in Figure 2, while characteristics data are given in Table 3.

 

02

Figure 2: Compensation basin and forebay of the power intake

 

Table 3: Characteristics data for the compensation basin and forebay of power intake

Table3